IshooThe Ishoo manual

Tasks / Page 24 of 53

This page is one part of The Ishoo manual. The complete manual is a single page, short enough to read in one go: ishoo.app/docs/

Splitting big tasks

Ishoo splits a big task into smaller child tasks and keeps the link between them. The parent shows its children under Lineage, each child shows which task it was split from, and the timeline records one Split event with the children as chips.

A task gets split when it’s too big to land in one go, often because the change-size limit blocked it. Each child is a full task with its own scope, and the parent stays open as an umbrella.

When every child is done, the parent shows Ready to resolve: its results can be written and it can be closed.

How it works: a real parent–child link

A split is recorded as its own kind of relationship, separate from “depends on” and “related”. That’s what lets Ishoo show one Split event instead of many unrelated Filed rows, and know when an umbrella task is finished.