Priority levels
Ishoo has five priority levels. Urgent: the cost grows while it waits, so it goes first across all plans. Important: high value, but waiting costs nothing extra. Mid: normal work. Later: deferred. Shelved: kept as knowledge, out of the queue.
| Level | Use it when | Effect |
|---|---|---|
| Urgent | Leaving it alone makes things worse over time. | |
| Important | It matters a lot, but waiting doesn’t add cost. | |
| Mid | Ordinary work. | |
| Later | Worth doing, not soon. | |
| Shelved | Worth remembering, not worth doing now. |
A task can also have no level, which sits between Mid and Later. Each task has at most one level.
How it works: urgent means rising cost, not big
The test for Urgent is direction, not size: if nobody touches it, does the cost keep going up? A large but stable problem is Important, not Urgent. Keeping Urgent rare is what lets it interrupt other plans without the queue turning into noise. Tasks that block an urgent task inherit its pressure.